
How to process textile material testing reports? What are the testing items and standards? Baijian Testing can provide you with materials and other related testing services p>
Testing cycle: 3-15 working days (can be expedited)
Report qualifications: CNAS, CMA, CAL, etc.
Testing cost: quoted based on customer needs and experimental complexity
Testing items:
Inner diameter deviation, compressive strength, low-temperature bending performance of skeleton, equivalent filter cloth Aperture, bolt hole diameter, average wall thickness, filter cloth penetration Coefficients, permanent deformation of covering materials, compressive deformation, outer diameter deviation, steel wire spacing, diameter of bolt hole distribution circle
Testing standards:
1. GB/T 31538-2015/5.10 Pre embedded grouting pipes for concrete joint waterproofing
2. GB/T 31538-2015/5.11 Pre embedded grouting pipes for concrete joint waterproofing
3. GB/T 8806-2008/5.2.3 Determination of plastic component dimensions for plastic pipeline systems
4 JC/T 937-2004/7.3 Flexible Permeable Pipe
5. GB/T 8806-2008/5.3.3 Determination of Plastic Component Dimensions of Plastic Pipeline Systems b
6. GB/T 8806-2008/5.3.4 Determination of Plastic Component Dimensions of Plastic Pipeline Systems a
7. GB/T 15789-2016 Geotextiles and Related Products Determination of Vertical Permeability Characteristics under No Load
8. GB/T 8806-2008/7.7 Determination of Plastic Component Dimensions of Plastic Pipeline Systems
9 GB/T 14799-2005 Geotextiles and related products - Determination of effective pore size - Dry sieve method
10. GB/T 8806-2008/7.4 Determination of plastic component dimensions in plastic piping systems
11. GB/T 31538-2015/5.7 Pre embedded grouting pipes for concrete joint waterproofing
12. GB/T 31538-2015/5.6 Pre embedded grouting pipes for concrete joint waterproofing
Testing process steps
1. Telephone communication and confirmation of requirements p> 2. Recommend solutions and confirm quotations p> 3. Mail samples and arrange testing p> 4. Progress tracking and result feedback p> 5. Provide reports and after-sales service p> 6. If urgent or priority processing is required P>