Electronics
Testing of electronic and electrical products (sinusoidal vibration)List and introduce project stand
Testing of electronic and electrical products (sinusoidal vibration)List and introduce project stand
Click here for online message:
Drop us a line
Service@Baijiantest.Com
Testing of electronic and electrical products (sinusoidal vibration)List and introduce project stand

How to do the test report? Why do you need to do product inspection? Third-party testing institutions provide product testing services in various industries, and there are many cooperative laboratories across the country, mainly serving companies, enterprises, individual businesses, universities and scientific research.

Report qualification: CNAS, CMA, CAL, etc

. Presentation style: electronic

version of the testing cycle: 3-15 working days (expedited can be expedited)

Testing cost: Quotation according to customer needs and experimental complexity

Sample size: Choose to send samples or visit the door according to the sample size

Scope

This part of GB/T 2423 provides a standard test method process to determine the ability of components, equipment, and other products (hereinafter referred to as samples and products) to withstand sinusoidal vibrations of specified severity. If the test requires non packaged form, it indicates that the test sample is not packaged. However, if the test requires samples to be packaged, use packaged products and treat the product and its packaging as -. test samples The purpose of this experiment is to determine the mechanical weakness and/or characteristic reduction of the sample. Use this information, combined with relevant specifications, to determine whether the sample is acceptable. In some cases, this test method can be used to demonstrate the mechanical structural integrity of samples and/or to study their dynamic characteristics. Components can also be classified based on their ability to withstand different levels of severity in this test

Normative references

The following documents are essential for the application of this document.

. For dated references, only the dated version applies to this document. For undated references, the latest version (including all modification orders) applies to this document GB/T 27025-2008 General Requirements for the Capability of Testing and Calibration Laboratories (ISO/IEC 17025: 2005, IDT) IEC 60068-1 Environmental Testing Part 1: Overview and Guidance (Environmental Testing Part 1: General and Guidance)

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

100% inspection and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China

Testing process

1, sending samples

2, checking requirements

3, targeted quotation

4, both parties determine, sign a contract, start

the experiment

5, complete the experiment: the testing cycle (can be expedited) will be changed according to the sample and its testing items / methods, you can consult the engineer

6, issue a test report, and provide post-service.