Electronics
Electronic active energy meter (Level 1 and Level 2) detectionHere's what you need to know
Electronic active energy meter (Level 1 and Level 2) detectionHere's what you need to know
Click here for online message:
Drop us a line
Service@Baijiantest.Com
Electronic active energy meter (Level 1 and Level 2) detectionHere's what you need to know

How to do the test report? Why do you need to do product inspection? Third-party testing institutions provide product testing services in various industries, and there are many cooperative laboratories across the country, mainly serving companies, enterprises, individual businesses, universities and scientific research.

Report qualification: CNAS, CMA, CAL, etc

. Presentation style: electronic

version of the testing cycle: 3-15 working days (expedited can be expedited)

Testing cost: Quotation according to customer needs and experimental complexity

Sample size: Choose to send samples or visit the door according to the sample size

Scope

This standard is only applicable to newly manufactured static active energy meters (hereinafter referred to as instruments) with accuracy levels 1 and 2 for measuring AC active energy in the frequency range of 45 Hz to 65 Hz and their type tests This standard only applies to static active energy meters for indoor and outdoor use consisting of measuring elements and one or more registers installed in the same case. It is also applicable to one or more work indicators and one or more test outputs

This standard does not apply to:

a) active energy meters with terminal voltage exceeding 600V (line to line voltage for multiphase instruments) B) Portable instrument C) The data interface of the instrument register If the display and/or storage device is externally connected, or if other devices (such as maximum demand indicators, telemetry devices, time switches, or remote controllers) are included in the table, this standard only applies to the metering section This standard does not include acceptance testing and consistency testing, and the basic guidelines for acceptance testing are provided in GB/T17442 The reliability requirements are also not included in this standard, as there is no suitable accelerated testing method for accepting type test documents to verify this requirement

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

100% inspection and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China

Testing process

1, sending samples

2, checking requirements

3, targeted quotation

4, both parties determine, sign a contract, start

the experiment

5, complete the experiment: the testing cycle (can be expedited) will be changed according to the sample and its testing items / methods, you can consult the engineer

6, issue a test report, and provide post-service.