Electronics
Testing of electronic and electrical devices and lightning protection facilitiesWhat do you know abo
Testing of electronic and electrical devices and lightning protection facilitiesWhat do you know abo
Click here for online message:
Drop us a line
Service@Baijiantest.Com
Testing of electronic and electrical devices and lightning protection facilitiesWhat do you know abo

How to do the test report? Why do you need to do product inspection? Third-party testing institutions provide product testing services in various industries, and there are many cooperative laboratories across the country, mainly serving companies, enterprises, individual businesses, universities and scientific research.

Report qualification: CNAS, CMA, CAL, etc.

Testing costs: according to customer needs and experimental complexity, quotation

sample size: according to the sample

size to choose the sample or door-to-door

display style: electronic version

Testing cycle: 3-15 working days (expedited).

Scope

This standard specifies the types and safety technical requirements for system grounding, with the aim of ensuring the safety of people and equipment This standard is applicable to power grids with a nominal system voltage of 220/380V AC

Normative reference documents

The clauses in the following documents become the clauses of this standard through reference.

. For dated reference documents, all subsequent amendments (excluding corrected content) or revisions are not applicable to this standard. However, parties to agreements based on this standard are encouraged to study whether the latest versions of these documents can be used. For undated references, the latest version applies to this standard GB/T 4776-2008 Electrical Safety Terminology

GB13955 Installation and Operation of Residual Current Operated Protection Devices

GB 16895 3-2004 Electrical installations of buildings - Part 5-54: Selection and installation of electrical equipment - Earthing configuration, protective conductors, and protective bonding conductors (IEC 60364-5-54:2002, IDT)

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

100% inspection and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China

testing process

,

telephone communication, confirm the demand;

2. Recommend the plan and confirm the quotation;

3. Mailing samples and arranging testing;

4. Progress tracking and result feedback;

5. Issue reports and after-sales service;

6. If it needs to be expedited, priority processing;