
This standard specifies the insulation requirements and corresponding insulation tests for specified windings and their terminals. This standard also recommends the air gap between the live part of the oil immersed power transformer bushing and the grounding body (Chapter 16). Guidelines in this regard can be found in IEC 60071. The insulation level and insulation tests specified in Chapters 4, 5, 6, and 7 of this standard are only applicable to internal insulation. Although it is reasonable to use the rated withstand voltage specified for the internal insulation of transformers as the reference for external insulation, this approach may not be in line with all practical situations. The failure of non self restoring internal insulation is catastrophic and usually leads to the long-term shutdown of the transformer. However, when external flashover occurs, it may only cause a brief interruption of operation without causing permanent damage. Therefore, in order to improve safety, users can specify that the test voltage value of the internal insulation of the transformer is higher than that of the external insulation of other equipment in the system. When there is such a difference, the outer insulation gap distance of the transformer must be adjusted to fully withstand the test requirements of the inner insulation P>
Function of testing report:
1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report
2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms 3. Used as a sales report: issuing legally effective testing reports to make consumers more confident 4. Papers and research: Provide professional personalized testing needs 5. Judicial services: providing scientific, fair, and accurate testing data 6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problemsBaijian and testing process:
1. Telephone communication and confirmation of requirements
2. Recommend solutions and confirm quotations 3. Mail samples and arrange testing 4. Progress tracking and result feedback 5. Provide reports and after-sales service 6. If urgent or priority processing is requiredTesting and testing characteristics:
1. The testing industry is fully covered, meeting different testing needs
2. Fully cover the laboratory and allocate localized testing nearby3. Engineers provide one-on-one services to make testing more accurate
4. Free initial testing, with no testing fees charged
5. Self service order delivery for free on-site sampling
6. Short cycle, low cost, and attentive service 7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc 8. The testing report is authoritative and effective, and is generally used in China