Electrical Products GB 50229-2019 Fire Protection Code for Design of Thermal Power Plants and Substa
Electrical Products GB 50229-2019 Fire Protection Code for Design of Thermal Power Plants and Substa
Click here for online message:
Drop us a line
Service@Baijiantest.Com
Electrical Products GB 50229-2019 Fire Protection Code for Design of Thermal Power Plants and Substa

Terminology

Main power house

The main power house of a coal-fired power plant is a building composed of a steam turbine room, a centralized control building (turbine boiler control room), a deaeration room, a coal bunker room, a boiler room, etc The main building of the gas turbine plant is composed of a gas turbine room, a steam turbine room, a centralized control room, and a waste heat boiler

Central control building

A factory building in a thermal power plant that centrally controls two or more units and auxiliary systems.

. Including centralized control room, electronic equipment room, cable interlayer, battery room, shift handover room, and auxiliary room

Electrical control building in the main control building

A building in a thermal power plant that centrally controls the main electrical systems under non unit control mode, and a building in a substation that centrally controls the main electrical systems and equipment.

. It generally consists of the main control room, electronic equipment room, cable interlayer, battery room, shift handover room, and auxiliary room

Network Control Building

A building in a thermal power plant that controls the power network system or equipment of a booster station separately.

. Generally composed of electronic equipment rooms, battery rooms, and auxiliary rooms, it is usually an unmanned building

Switchgear control building in the network relay room

A building in a thermal power plant that controls the main electrical equipment of the main and auxiliary switchyards.

Power distribution building

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

Baijian and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China