Electronics
Electric Power Safety Tools GB 26859-2011 Electric Power Safety Work Regulations (Power Line Part)
Electric Power Safety Tools GB 26859-2011 Electric Power Safety Work Regulations (Power Line Part)
Click here for online message:
Drop us a line
Service@Baijiantest.Com
Electric Power Safety Tools GB 26859-2011 Electric Power Safety Work Regulations (Power Line Part)

This standard specifies the basic electrical safety requirements for power production units and personnel working in power production sites. This standard applies to all electrical equipment and related locations used by power generation enterprises with voltage levels of 66kV and above; All electrical equipment and related places used by transmission, transformation, and distribution enterprises with voltage level facilities of 35 kV and above; Electrical equipment and related places used by electricity consuming units with voltage levels of 220 kV and above. Other power enterprises and consumers can also refer to it for use. The following normative references are essential for the application of this document. For dated references, only the dated version applies to this document. For undated references, the latest version (including all modification orders) applies to this document. GB/T 2900.20-1994 Electrotechnical Terminology, High Voltage Switchgear (IEC 60050 (IEV): 1994, NEQ) GB/T 2900.50-2008 Electrotechnical Terminology for Power Generation, Transmission and Distribution, General Terminology (IEC 60050-601; 1985, MOD) GB 26860-2011 Code for Electrical Safety Operation - Electrical Part of Power Plants and Substations - Terms and Definitions GB/T 2900,20-1994, GB/T 2900,50-2008, and the following terms and definitions apply to this document. 3.1 Low voltage; LV is used for voltage levels of 1000 V and below in AC power systems for distribution. [GB/T 2900.50-2008, Definition 2.1 601-01-26] 3.2 High voltage; HV (1) usually refers to a voltage level that exceeds low voltage. (2) In specific cases, it refers to the voltage level of transmission in the power system. [GB/T 2900.50-2008, Definition 2.1, 601-01-27] 3.3 Electrical generation stations in power plants are composed of buildings. A factory that produces electrical energy consisting of energy conversion equipment and all necessary auxiliary equipment. [GB/T 2900.50-2008, Definition 2.3 601-03-01]

Function of testing report:

1. Project bidding: Issue authoritative third-party CMA/CNAS qualification report

2. Online e-commerce platform entry: Quality inspection report recognized by major e-commerce platforms

3. Used as a sales report: issuing legally effective testing reports to make consumers more confident

4. Papers and research: Provide professional personalized testing needs

5. Judicial services: providing scientific, fair, and accurate testing data

6. Industrial problem diagnosis: Verify the troubleshooting and correction of industrial production problems

Baijian and testing process:

1. Telephone communication and confirmation of requirements

2. Recommend solutions and confirm quotations

3. Mail samples and arrange testing

4. Progress tracking and result feedback

5. Provide reports and after-sales service

6. If urgent or priority processing is required

Testing and testing characteristics:

1. The testing industry is fully covered, meeting different testing needs

2. Fully cover the laboratory and allocate localized testing nearby

3. Engineers provide one-on-one services to make testing more accurate

4. Free initial testing, with no testing fees charged

5. Self service order delivery for free on-site sampling

6. Short cycle, low cost, and attentive service

7. Possess authoritative qualifications such as CMA, CNAS, CAL, etc

8. The testing report is authoritative and effective, and is generally used in China